London Data Center

Shell and Core Data Center with six data halls over two levels, and four levels of accommodation provided adjacent.

Project Delivery

RIBA Stage 3

  • Design Validation
  • Architectural drawings reviews through the stage for compliance with life safety requirements
  • Site wide planning including fire vehicle access, performance criteria for fire water supplies, hydrants, etc.
  • Team coordination through the stage to ensure the fire strategy and requirements from a life safety perspective are understood
  • Incorporation of client property protection and insurance requirements
  • Preparation of a Stage 3 Fire Strategy Report

RIBA Stage 4

  • Continued team coordination
  • Advise on materials for construction and performance requirements for fire safety systems
  • Stage 4 Fire Strategy Report
  • Project London Data Center
    Sector Data Centers
    Client Confidential
    Services provided RIBA stage 3 and 4