Cambridge House
Regeneration of the former “In & Out” Club to provide a unique hotel experience in central London. An iconic building located in the heart of London, the proposed regeneration of the Grade 1 listed site presented design challenges due to the sympathetic nature of the restoration. Containing several floors of sleeping accommodation, the building also contains large scale amenity facilities such as restaurants, a cigar room and pool facilities to name but a few.
Project Delivery
Joule Group are currently progressing through detailed design in collaboration with Ardmore and PDP London on the iconic Cambridge House redevelopment in London. Joule Group are currently responsible for assisting throughout the construction phase of the scheme having previously developed an alternative fire strategy approach. The support element comprises oversight of fire related derogations that evolve on the scheme and in particular one of such historical interest. Joule Group are proactively coordinating the design through interdisciplinary architectural and engineering workshops to ensure the applicable standards and requirements are understood and incorporated into the design to maintain a level of fire life safety commensurate with the requirements of the Building Regulations and client requirements.
Image: Mantage UK and Motcomb Estates
Project
Cambridge House
Sector
Leisure & Entertainment
Client
Ardmore Construction
Services provided
Alternative fire strategy approach, Computational fluid dynamics modelling, Technical support
Location
London
Region
UK
Back to all projects